We’re pleased to announce that Orchard Construct has commenced works at Medway Valley Leisure Park, delivering a programme of carriageway resurfacing, car park improvements and infrastructure upgrades.
The project includes:
🔹 6,000m² of Carriageway Resurfacing
Plane off existing surface by 40mm.
Apply emulsion tack coat.
Lay 40mm of 10mm Stone Mastic Asphalt (SMA).
🔹 5,900m² of Car Park Improvements
Remove existing surface.
Install Type 1 sub-base to suit levels.
Apply hot K170 bitumen emulsion surface dressing, with 10mm stone rolled in to achieve a shingle finish.
🔹 Additional Infrastructure Works
Isolated kerb repairs.
Installation of new lighting infrastructure.
A great project for the team, delivering improvements to the site's road network, parking facilities and wider infrastructure.
We look forward to sharing progress as the works develop!